Project Name
Four laning of Bangalore-Chennai Expressway from Km 204.500 to Km 230.000 (Arakkonam to Kancheepuram Section) under Bharatmala on Hybrid Annuity Mode (Phase III/Package – III) in the State of Tamil Nadu.
The Government of India had entrusted to the National Highways Authority of India (NHAI/Authority), the development, maintenance and management of Four laning of Bangalore-Chennai Expressway from Km 204.500 to Km 230.000 (Arakkonam to Kancheepuram Section) under Bharatmala (Phase III/Package – III) (the "Project") on Design, Build, Operate and Transfer (the "Hybrid Annuity") basis. The Site of the Project Highway is a section of National Expressway (NE-07) from Km 204+500 to Km 230+000 in the State of Tamil Nadu. The Alignment of the project road starts near Karnavoor and runs through nearby villages namely, Mahendravadi, Perapperi, Uliyanallur, Vepperi, Punnai, Vettankulam, Asanellikuppam, Sayanavaram, Nelvai, Pallur, Thirumalpur, Govindavadi, Putheri, Maniachi, Veliyur, Parandhur, Siruvakkam and ends near Thandalam. The total length of the project stretch is 25.50 km, which runs through Ranipet and Kancheepuram Districts. In accordance with the provisions of the Concession Agreement, the Four Lane Divided Carriage Way with Flexible Pavement for the entire Project Highway shall be undertaken by Concessionaire.
Latest Update
Contract Information
Name of Work | Four laning of Bangalore-Chennai Expressway from Km 204.500 to Km 230.000 (Arakkonam to Kancheepuram Section) under Bharatmala on Hybrid Annuity Mode (Phase III/Package – III) in the State of Tamil Nadu. |
---|---|
Name of Authority/Employer | National Highways Authority of India (NHAI) G-5 & 6, Sector-10, Dwarka,New Delhi -110075 |
Name of Concessionaire | M/s. D.P. JAIN BANGALORE-CHENNAI EXPRESSWAYS PVT. LTD., Shop No.L-8,Himalaya Accord Apartments, Opp Law College, Amravati Road, Nagpur, Maharashtra - 440010 |
Independent Engineer | M/s MSV International Inc. In Association with MSV International Tech Pvt. Ltd. |
Length of Road (DesignLength) | 25.50 Kms |
Total Bid Cost | Project Cost of Rs.1057.00 Cr (as per Concession Agreement) |
Letter of Award Date | 16.09.2021 |
Date of ConcessionAgreement | 04.02.2022 |
Appointed Date | 08.08.2022 |
Construction Period | 730 Days |
Maintenance Period | 15 years from COD |
Salient Features of Project
Description | Length (Km) or No’s |
---|---|
4 - Lane Divided Carriage Way | 25.50 Kms |
Connecting Roads / Ramps | 6.776 Kms |
Major Bridge | 07 Nos |
Minor Bridge | 01 No. |
Interchanges / Vehicular Overpass | 02 Nos |
Vehicular Underpass | 02 Nos |
Light Vehicular Underpass | 01 No. |
Small Vehicular Underpass | 13 Nos |
Box Culverts | 44 Nos |
Toll Plaza | 01 No. |
Wayside Amenities (Rest Area) | 02 Nos |